Skip to content

Completed projects

When a production is finished, its owner can mark the project Completed. The whole project becomes read only for everyone on it, the owner included, and it moves off your main project list into its own Completed view. Collaborators keep their access, and the owner can reopen it at any time the plan allows.

Only the project owner, the person who created it, sees the action, and only while they can still edit in the project’s workspace.

  1. Open the project and click Project Settings at the bottom of the project sidebar.
  2. Near the bottom of the dialog, next to Complete project, click Complete.
  3. Confirm with Complete in the Complete project? dialog, or click Cancel.

On the dashboard, Mark completed in the project card’s menu opens the same dialog. So does Mark completed in the Archive project? dialog, which the dashboard shows when the owner archives a project they could complete instead.

If completing does not go through, a short Could not complete message appears and you can try again. A project that a brief import is still building cannot be completed until the import finishes.

Every page you could open before still opens, and everything on it can be read, but nobody can change it. A Completed strip with a check icon sits above the page (on a phone it floats above the bottom bar), and for the owner it holds the Reopen button.

  • Nobody can edit content: not the script, shot list, schedule, cast and crew, gear, callsheets or documents. Project chat, script comments, canvas comments and reactions are closed too, including editing or deleting your own messages.
  • Project Settings is frozen: every field is disabled and Save Changes is off. Only the Complete or Reopen row works.
  • Open canvases switch over: anyone with a whiteboard or other canvas open at that moment is reconnected read only.
  • Unsynced offline edits are dropped: changes made offline that reach CineFlow after the project was completed are discarded with the message “Project completed. Changes discarded.”
  • Your personal things keep working: your own shot list layout and view settings, your notifications, and your ideas and personal to dos on the dashboard.
  • Share links keep opening: existing public links and document guest links still work, but an edit link only lets people view while the project is completed. Its edit access comes back when the project is reopened. No new links can be made. The owner and project admins can still revoke a link or turn an edit link into a view link.

A completed project can have a public film page on Backlot. Right after you complete a project in Project Settings, a Create the film page? dialog shows the project’s cover and title and the link the page will most likely get. Click Create film page to open Backlot in your browser, where the page is made as a draft from the project and you choose what to publish, or click Later. Completing a project never publishes anything by itself.

Completing from the project card’s menu on the dashboard skips the dialog. To come back to it at any time, click Film page in the Completed strip. Only the project owner sees the dialog and the button. If the project already has a film page, Backlot opens that page’s settings instead.

The owner clicks Reopen in the Completed strip, in Project Settings, or in the project card’s menu in the Completed view. There is no confirmation. If it fails, a short Could not reopen message appears.

Reopening is refused with the Project Limit Reached dialog when your plan has no room for it: see the limits below. The project then stays completed and readable.

  • Sidebar: under Projects, the Completed row sits between Starred and Archived and lists your completed projects. On a phone the dashboard bottom bar has a Completed button in the same place.
  • Dashboard: completed projects leave the dashboard’s Projects grid and Starred. In the Completed view their cards show a Completed status pill. The card menu keeps Archive for the owner, and the owner can still star the project, but Rename, the cover actions and Delete permanently are not offered.
  • Archived: a completed project that is archived shows only under Archived.
  • Search: Cmd K still finds completed projects and labels them Completed, and so does the Cmd T picker in the Mac and Windows apps.

Every number is in Billing and usage.

  • Paid plans: a completed project does not count toward your Projects limit. People who are only on completed projects do not take a place in the collaborator pool, and adding someone to a completed project does not take one either.
  • Free plan: completed projects still count toward both limits, exactly like open ones.
  • Reopening checks both limits. It is refused when your projects are already at the limit, or when the project’s collaborators and pending invites would take the collaborator pool over its limit with people not already in it. A reopen that brings nobody new goes through.
  • Moving to Free: completed projects count again. Nothing breaks, but new projects and new people are refused while you are over a limit.
  • Storage used by a completed project still counts on every plan.

When a project is completed or reopened, the owner and every collaborator hear about it, for example: Alex completed “Night Shoot”. The person who did it is not told, and a collaborator whose access to Project Overview is set to none is not told either. It appears under Updates in the notifications bell, and arrives by email or push as your Project updates row in Settings, Notifications says. See Personal settings.