Schedule shoot days
- Open your project and click Schedule in the sidebar.
- Click Add Shoot Day, pick the Date, optionally type a Label, and click Add day. Repeat for each day. Days are numbered by date order.
- Select a day in the Shoot Days rail.
- Click Add scene and pick a scene; its shots land on the day. Repeat until the day is built.
- Drag strips to set the running order. Set the day’s General call time from the day’s three-dot menu; times and the Estimated wrap recalculate automatically.
- Add non-scene items with Quick blocks (Crew Call, Lunch, Company Move, and more) or Custom Block. Drag a block between two shots of a scene to split the scene around it, or use a shot’s Split scene before this shot; a part’s menu has Rejoin with previous part, or Rejoin with next part on the first part.
- To move the unit during the day, click Starts at above the first block and pick where the day begins. Add a Company Move block, drag it into place, click Set destination on it, and pick the next location or search for a new address. Everything after the move happens there. Add another move for each further location.
- In the Roster panel, use Add cast and Add crew to assign people to the day, and Add location for any other place the day needs: pick one of the project’s saved locations, or search for an address, which becomes a saved location too.
Your schedule feeds callsheets automatically: link a callsheet to a shoot day and its scenes, times, cast, and crew flow in. See Create and send a callsheet.
To hand the schedule to others, use the Share popover: Export PDF (Compact or Detailed) or a public schedule link. See Share a read-only link.